top of page

PARK BLVD SAFE ROUTE TO SCHOOL

OAKLAND, CA

UDCE provided civil engineering to the City of Oakland Department of Transportation to implement its Safe Routes to Schools project along Park Boulevard at two major intersections. The primary objective was to provide safer crossings for students. The intersection of Park Blvd/ E 38th St/ 13th Ave and Greenwood Ave was realigned with major curb work to a typical four-legged, rectangular layout, eliciting slip turns and unprotected crossings. The intersection of Park Blvd/ Grosvenor Pl/ Alma Pl and Excelsior Ave received widened sidewalks and medians to shorten pedestrian crossing distances. The outbound Excelsior leg was converted to a bike-only inbound approach. The project included installing a new traffic signal at Park Blvd/ 13th Ave/ Park Blvd Way, and modifying the existing signal at Park Blvd/Excelsior Ave/ Grosvenor Pl/ Alma Pl.

Developer:

Oakland Department of Transportation

Designer:

UDCE

UDCE_Footer1.png
SAN FRANCISCO OFFICE

1 Bluxome Street, Suite 403
San Francisco, CA 94107
Tel: 415-658-5850

OAKLAND OFFICE

428 Alice Street, Ste 132
Oakland, CA 94607
Tel: 510-868-1085

  • White Instagram Icon
  • LinkedIn

WE WANT TO HEAR ABOUT YOUR PROJECT

Success! Message received.

bottom of page